The TEI Dust Suppression System for rock drills efficiently inject water into the drilling air, reducing dust by up to 98% to comply with local and federal safety regulations regarding dust and silica. Our TE30851R Misting System is equipped with a 25 gallon water tank that provides dust suppression for 4-8 hours depending on the size of the hole.
